Teaching Healing Searching Serving Home
 
Chancellor's Message
History/Background
Frequently Asked Questions
Projects
Web Cams: Watch Us Grow
Leadership: Committees, Participants
Ways to Give
Construction Timeline
Gallery
News and Information Center
Contact Us/Suggestions
UAMS Home
Growing Homepage

Giving To UAMS

Web Cams: Watch Us Grow

Live Web cameras are showing the changes on the UAMS campus.
For each link, a logon is required. Please enter the following:

User Id:     UAMS (all caps)
Password: UAMS (all caps)


Real Time Video Feeds

The following links open real time video views of construction at UAMS.

Video 1 is a view of the circular drive being built in front of the new
hospital entrance. The new drive will allow convenient patient drop offs and pick ups. It will lead to a tunnel entrance into the new parking deck.

Video 2 shows Hooper Drive, which has been converted from a two-lane street to a four-lane, divided boulevard. Two traffic circles also were built to improve the efficiency and safety.

Video 3 shows the front of the hospital expansion. The tunnel entrance to the new parking deck can be seen on the right. It will be in the middle of a circle drive. The new Psychiatric Research Institute building can be seen adjacent to the new hospital on the right.

Video 4 shows construction of the 12-floor Cancer Institute expansion on the other side of the sky bridge. A portion of the new hospital also can be seen on the right as it extends to the Outpatient Center.

Click here to view all four video feeds

When viewing each individual video, you can also take a snapshot. Click the snapshot button below the image and then right click on the image and choose "Save As" to save the image.

Education West Construction Area
This shows construction of a new education building just west of Hooper Drive. The first floor of the Education West building will be finished in August 2008, with the second floor expected to be completed by October. The UAMS Residence Hall, which opened in 2006, can be seen on the other side of the Education West building.
View the Education West Construction Area


 


 
A view of the existing dorm building from the east
Video 1 is a view of the hospital expansion looking east.
A view of the former Arkansas State Hospital (ASH) Auditorium
Video 2 is a view of the site of the work to reconfigure Hooper Drive as it goes in front of the hospital expansion and Psychiatric Research Institute.
A view of the construction of the new bookstore
Video 3 shows the front of the hospital expansion. The tunnel entrance to the new parking deck can be seen on the right. It will be in the middle of a circle drive.
A view of the existing dorm building from the west
Video 4 shows the hospital expansion looking west. The sky bridge from the hospital to the Outpatient Center and Arkansas Cancer Research Center can be seen in the distance. The UAMS Cafeteria can be seen at the ground level on the left.
Hooper Drive
Video 5 Hooper Drive Location Video




University of Arkansas for Medical Sciences
4301 W. Markham St., Little Rock, AR 72205


All contents © 2000- .

UAMS Online     Copyright Statement     Privacy Statement